Skip to content

Trout Lake Road overpass delays Friday

As a result of milling all four lanes, adjustments to traffic flow will be required throughout the day
trout lake road rail overpass construction turl 2017
File photo

Watch out for temporary changes to the traffic flow on Trout Lake Road from Giroux Street to the overpass tomorrow.

The Trout Lake Road milling operation from Giroux Street to the overpass will begin first thing in the morning and is expected to extend into the late afternoon.

The traffic signals at Giroux/Trout Lake Road will be bagged and replaced with traffic control people at each leg of the intersection.

As a result of milling all four lanes, adjustments to traffic flow will be required throughout the day.

Motorists are encouraged to use an alternate route during this time to avoid a delay and are encouraged to drive with care and according to the temporary conditions.