Beginning tomorrow, traffic on the Trout Lake Road Overpass will be reduced to two lanes (one lane in each direction) and eastbound traffic will be directed to the north side of the bridge as the south side will be closed to complete the installation of the waterproofing system.
Pedestrians will also be directed to use the sidewalk on the north side of Trout Lake Road.
All four lanes will be re-opened to traffic by the following week, weather permitting.